Salina Pier and Seafront Renovation
Contract No | AFI-BP-14-32-CTPR |
---|---|
Category | General Construction |
Contract Cost | $2,052,718.29 |
Location | PR 701, Salinas, PR |
Completed Date | Novemberr, 2015 |
Owner | A.F.I. - Agencia para el Financiamiento de la Infraestructura |
References | Alejandro Castro - Phone: 787-727-7700 - email: acastro@toroarquitectos.com Ing. Samir El Hage - Phone (939) 717-7133 - email; selhage@hagepsc.com |
Description | The Scope of Work includes the demolition of at least three abandoned or run- down structures, the cleaning and restoration of beach areas littered with concrete and steel debris, a sequence of two waterfront plazas, two small urban parks, sidewalks and roadway pavement. As one approaches the west end of the project from town, a new beachfront plaza will receive you. Moving eastward, what is now an abandoned fountain with a sculpture of fishermen on their boat will be replaced by a small park with trees and seating where the sculpture will become a focal point. Across the street a new sidewalk along the narrow roadway will connect with the newly restored and expanded municipal waterfront plaza which includes new kiosks for the rental of kayaks and sale of souvenirs, a new sea wall, steps to the beach and a restroom. Further east, a small triangular lot will be converted into a small park and will also house a small kiosk for bike rentals and the sale of snacks and refreshments. |